Installation, Testing and Commissioning of LT Panels
Installation, Testing and Commissioning of electrical equipment like HT/LT Switchgear, Transformers, HT/LT Motors, Alum. Bus-duct of rating 600/800/1000/1600/2500/3200 Amp, control panels, distribution boards, interlock testing, protection checks, primary and secondary injection, relay testing, etc
Installation, Testing and Commissioning of Power Control Centre, Main Power Distribution Board, Motor Control Centre, Main Lighting Distribution Board, Automatic Power Factor Correction Panel, thyristor Control Panel, HT/LT Bus ducts, Programmable Logic Control Panel and other panel boards as per tailor made requirement.
Laying of HT & LT power/control cables, special instrument & control cables underground or on trays, walls, structures, etc. as required.
Cable end termination of HT & LT, Outdoor/Indoor types using Heat Shrink/Push on type terminations and making of straight through joints using Compound / Heat Shrink type kits.
Installations & commissioning of instruments, sensors, cables, transmitters including support fabrication